Bid Opening and Results: What Follows the Deadline

Key Takeaways
- For municipal buyers, article 49 of the Loi sur les contrats des organismes municipaux (RLRQ, chapter C-65.01), in force since 1 April 2026, requires bids to be opened publicly in the presence of at least two witnesses, with each bidder's name and quoted price disclosed aloud.
- Opening is not award: the price read aloud comes before the compliance review, and the winner is published later, once that review is finished.
- Awards and submitted prices are republished as open data by the Secrétariat du Conseil du trésor, which makes every lost bid measurable rather than mysterious.
Bid opening is where a public tender stops being a hypothesis. You filed, the clock ran out, and your price gets read out loud to whoever bothered to show up in the room. Most contractors treat that as the end of the story. It is closer to the start of one, because this is the point where a tender turns into market intelligence — if somebody goes and collects it.
What happens at the opening
For municipal buyers, the rule now sits in article 49 of the Loi sur les contrats des organismes municipaux (RLRQ, chapter C-65.01), in force since 1 April 2026, which carried over what article 935 of the Code municipal du Québec and article 573 of the Loi sur les cités et villes used to set out. The Muni-Express explanatory guide from the ministère des Affaires municipales et de l’Habitation, read in September 2026, sums up the framework: the opening must be held publicly, in the presence of at least two witnesses, and each bidder’s name and quoted price are disclosed aloud. Contractors who bid may attend, at the time and place named in the tender.
None of that is decorative. The FQM’s guidance on the public opening of bids describes an opening held privately, or a public procedure that is not followed, as a substantial breach of a fundamental rule of the public tendering process, with the legal consequences that follow from it.
Two things are worth pinning down before they cost you money. A bid that arrives after the closing time is set aside at the opening, whatever number is inside the envelope. And opening is not award: the price read aloud comes before anyone reviews admissibility and conformity, so the lowest figure heard that morning is not necessarily the one that ends up with the contract. A bid set aside on a paperwork error may well have been the cheapest in the room.
Where to find results and awards
Both the opening results and the award attach to the notice on SEAO. The results — who bid, at what price — appear shortly after the opening: per the same guide, the buyer has four business days to disclose the prices on SEAO. The award comes later: the buyer has to review each bid, then get the decision approved internally. Depending on the file, that can take weeks. Silence is not a signal.
The same information is then republished as open data. The Secrétariat du Conseil du trésor publishes a SEAO dataset on Données Québec covering current tender notices, concluded contracts and information on the associated notice, additional expenses tied to a contract, and final information on completed contracts. Per the dataset description read in September 2026, the JSON files use a format inspired by the Open Contracting Data Standard and start in March 2021, while the XML format lets you consult contracts concluded since 2009. It is public data under a CC-BY licence.
A notice read when it is published tells you what is coming. The same notice read six months later, with its award attached, tells you who won, for how much, and against how many bidders. That is the half of the system almost nobody uses.
Reading your competitors’ prices
An award record holds very little, but every field earns its place: the buyer, the winning firm and its enterprise number, the amount awarded, the date, and often the number of bids received. Individual bidders’ submitted prices sit alongside it where the buyer publishes them.
With that, you can calculate the one number that matters after a loss: your gap to the winner.
Illustrative example — none of these figures come from a real contract. A municipality awards a roof replacement on a public works garage. Nine firms bid. The contract goes out at $268,000; you submitted $305,000. That is a $37,000 gap, roughly 14% above the winner. One data point like that says almost nothing. Twenty of them, gathered over six months, say quite a lot. An average gap of 3% means you are genuinely in the race and the next one is winnable. An average gap of 25% means you are not competing for the same work the winners are — wrong job size, wrong cost structure, or a rival amortizing equipment you rent by the week.
You can see this kind of survey by trade and region on SEAO Radar, and the SEAO Intelligence service delivers a monthly brief of the awards and amounts in your trade within your radius, without anyone in the office working through data files.
Losing usefully: the debrief after every bid
A lost bid costs the same as a won one. The difference is what you take from it. Thirty minutes after each award is enough:
- Ask the contact named on the notice for the opening results, often recorded in an opening report (procès-verbal d’ouverture).
- Note who won, at what amount, and how many bidders showed up.
- Calculate your gap to the winner, in dollars and as a percentage.
- If you were set aside for a reason other than price, record the exact reason. That is the one class of error you can eliminate entirely.
These notes are worth nothing individually and a great deal in aggregate. They feed straight into tracking your bid-to-win ratio by buyer and by category, which our article on the go/no-go decision before you bid covers in detail.
What comes next
We archive published awards week after week, and we will publish trade-by-trade analyses here: who is winning electrical contracts on the South Shore, what school service centres actually pay for ventilation work, how bidder counts are moving by category. They will appear in the public procurement category as they are written, and the current state of the market is always visible on SEAO Radar.
For the whole arc, from spotting a notice to the award, start with the full guide to winning Québec public contracts, and the electrical growth playbook puts public work next to the rest of your business development.
A contractor who knows exactly where they stand against their competitors makes different decisions. That is what the Growth Score™ surfaces: what your business already knows about its market, what it still does not, and which gap pays the most to close first.
Alliance Optima is not affiliated with SEAO or the Government of Québec. Award data is descriptive and never a price recommendation — the official notice and its addenda always govern, at seao.gouv.qc.ca.
Frequently Asked Questions
Is bid opening public in Québec?
For municipal bodies, yes. Article 49 of the Loi sur les contrats des organismes municipaux (RLRQ, chapter C-65.01), in force since 1 April 2026, requires bids to be opened publicly in the presence of at least two witnesses, with each bidder's name and quoted price disclosed aloud. The rule carries over what article 935 of the Code municipal and article 573 of the Loi sur les cités et villes used to set out. The opening happens at the time and place stated in the tender, and bidders have the right to attend.
Does the lowest price read at the opening win the contract?
Not automatically. The opening only records the prices received; the buyer then reviews each bid for admissibility and conformity. A bid set aside as non-compliant may well have been read aloud as the lowest.
How long after opening is the contract awarded?
It depends on the complexity of the file and the buyer's internal approvals. The compliance review takes days or weeks, and the award is published once the decision is made — read nothing into a few weeks of silence.
Can I see what my competitors bid?
Yes. The prices announced at the opening, the winner and the contract amount are public information, republished as SEAO open data by the Secrétariat du Conseil du trésor under a CC-BY licence.
Can I ask why my bid was set aside?
Yes, and you should. Ask the contact named on the notice for the opening results and the reason recorded. A non-compliance reason is information you can act on before the next bid.
Which public tenders fit your business?
Tell us your trade, territory and contract size. Your free SEAO Profile™ ranks the open tenders that match, with a score that explains itself, in two minutes.
Get My Free SEAO Profile™Follow Alliance Optima in Google
Add us as a preferred source and our analysis shows up more often in your Google results and AI answers.
Add as a preferred source